Image
EAN-130065935829126   EAN-13 barcode 0065935829126
UPC-A065935829126   UPC-A barcode 065935829126
Product NameKill Bill, Vol. 1 / Kill Bill, Vol. 2 / From Dusk Till Dawn
LanguageEnglish
CategoryElectronics / Photography: A/V Media: Movie
Short DescriptionDVD
Amazon.comA Buy on Amazon ~ B002HFWB0I
Price New35.90 US Dollars    (curriencies)
Price Used23.49 US Dollars    (curriencies)
RatingR - Restricted
IMDbIMDb Link
TrailerWatch The Trailer
Run Time108 minutes
CastGeorge Clooney, Quentin Tarantino, Harvey Keitel, Juliette Lewis
DirectorRobert Rodriguez
GenreACTION,CRIME,HORROR
Run Time108 minutes
Weight25 hundredths pounds    (convert)
BindingBlu-Ray
Release Year1996
FormatBlu-ray, Import, NTSC
Run Time108 minutes
Long DescriptionAfter a bank heist in Abilene with several casualties, the bank robber Seth Gecko and his psychopath and rapist brother Richard Gecko continue their crime spree in a convenience store in the middle of the desert while heading to Mexico with a hostage. They decide to stop for a while in a low-budget motel. Meanwhile the former minister Jacob Fuller is traveling on vacation with his son Scott and his daughter Kate in a RV. Jacob lost his faith after the death of his beloved wife in a car accident and quit his position of pastor of his community and stops for the night in the same motel Seth and Richard are lodged. When Seth sees the recreational vehicle, he abducts Jacob and his family to help his brother and him to cross the Mexico border, promising to release them on the next morning. They head to the truck drivers and bikers bar Titty Twister where Seth will meet with his partner Carlos in the dawn. When they are watching the dancer Santanico Pandemonium, Seth and Richard fight with three bodyguards. But soon they discover that the bar is a coven of vampires and they need to fight until dawn to leave the place alive.
Similar Items0065935587675: Apocalypse Now
0031398144359: Pulp Fiction
0024543417729: Shape Of Water
Created04-17-2012 7:56:29pm
Modified06-06-2019 1:37:35am
MD56ac7bb53150946e0039ef6bd75b001e0
SHA2561c90668c3ca5525d6969c2e90d1405bf04e4836ff5e5db8fee954965c598ccc3
Search Googleby EAN or by Title
Query Time0.0095661

Article of interest

This time it wasn't our fault. There were power issues due to a substation down the street catching fire. We don't know the details of how it happened. But we do know that there were a lot of surges and some made it through our UPS to take out our main server.

We keep everything backed up so we only lost about 1 day of data. But because the equipment was damaged we had to rebuild some parts our system from scratch.

Sadly, it took a little longer than expected. Once the main systems came back up there were some confugration issues that we struggled with. But we are back and we have replaced our dead UPS boxes with new ones. They saved most of the equipment from any real damage. Only one box suffered serious damage. It just happened to be our main server instad of one of our backup systems.

Oh well, we will get any lingering bugs ironed out in the next day or two and then start back up on our system upgrade to help speed up the site some more.

Thanks for your understanding.

Close

Search

Close

Share

Close

Dialog