Image
EAN-130027616921413   EAN-13 barcode 0027616921413
UPC-A027616921413   UPC-A barcode 027616921413
Product NameIndian Runner
CategoryElectronics / Photography: A/V Media: Movie / TV
Amazon.comA Buy on Amazon ~ B0007XBKCM
SKUE_DVD_0027616921413
Price New8.47 US Dollars    (curriencies)
Price Used3.71 US Dollars    (curriencies)
RatingR - Restricted
IMDbIMDb Link
TrailerWatch The Trailer
Run Time127 minutes
Aspect Ratio1.85:1
CastDavid Morse, Viggo Mortensen, Valeria Golino, Patricia Arquette
DirectorSean Penn
GenreDRAMA
Run Time126 minutes
BindingDvd
Release Year1991
FormatNTSC, Color, Dolby, Closed-captioned, Widescreen
Run Time126 minutes
Long DescriptionAn intensely sad film about two brothers who cannot overcome their opposite perceptions of life. One brother sees and feels bad in everyone and everything, subsequently he is violent, antisocial and unable to appreciate or enjoy the good things which his brother desperately tries to point out to him. Frank understands the atrocities of life as a big picture; Joe does not. Joe is content to enjoy smaller pleasures: children, family, routine. Joe mistakenly believes he can straighten his little brother out and convince him that life is good. Frank is a cursed man. He is cut between his love for his brother and his repulsion at self-indulgent contentment. The result is a painful story of heartbreak, heartache, disappointment, despair, and the tragic side of love.
Similar Items0786936228120: Hidalgo
0738329201579: Far From Men
0717951004253: A Walk on the Moon
0629159049397: Everybody Has A Plan
0079404312781: Appaloosa
0065935834335: The Road
0043396050648: 28 Days
0025192358913: Captain Fantastic
0014381901627: American Yakuza
0011301631374: Borderline
View 8 more similar items
Created09-06-2018 12:05:06am
Modified03-23-2019 11:11:31am
MD529302b9814f4833ae418fcc792e5534b
SHA256f07a3ca237070248f92608cf7d2f758a3343ee4aa74594e496d878e10f57c969
Search Googleby EAN or by Title
Query Time0.0208979

Article of interest

This weekend was a long one. We installed a new database server and copied all the data from the old server to the new one.

Then of course, we had to sync all the new data that collected on the old server while we were setting up the new server.

It was a time consuming process but we didn't have even one minute of down time over the weekend. The switch over was seamless.

The old server is becoming our backup server with instant data replication. This way, we no longer need to shut the site down for a couple hours each week to perform data backups. We can also run some of the more processor intense extract processes using the backup server instead of the live main server.

All these changes should mean more up time, faster response time and fewer issues long term.

Close

Search

Close

Share